Starbucks Drive Thru (East Kilbride)
Refurb of Toilets and Flooring, Starbucks Drive Thru, East Kilbride
- Project : Starbucks Drive Thru, East Kilbride
- Duration : 5 days.
- Work Carried Out : Refurb of Toilets and Flooring.
Refurb of Toilets and Flooring, Starbucks Drive Thru, East Kilbride