Starbucks Drive Thru

Starbucks Drive Thru (East Kilbride)

Refurb of Toilets and Flooring, Starbucks Drive Thru, East Kilbride

  • Project : Starbucks Drive Thru, East Kilbride
  • Duration : 5 days.
  • Work Carried Out : Refurb of Toilets and Flooring.