Commercial Work

Commercial & Domestic Tiling Scotland

Our tiling services range from simple bathrooms to large scale flooring projects. Have a look at some of the jobs we have recently completed. As always, our tilers are time served and fully insured giving you the peace of mind that comes from working with Scotland’s leading tilers.

Cuillin Hills Hotel (Isle of Skye)


The Cuillin Hills Hotel in Portree, offers luxury 4 star accommodation on the Isle of Skye, with some of the finest and most spectacular views from any hotel in Scotland.

  • Project : Cullin Hills Hotel.
  • Duration : 2 Weeks.
  • Work Carried Out : 14 bathroom refurbishments.
See Our Work

Hallmark Hotel Glasgow


The Hallmark Hotel Glasgow is in an enviable location in the heart of vibrant Glasgow. Our location oozes convenience and is great for arriving by train into Glasgow Central or Glasgow Queen Street and just a short 9 mile drive away from Glasgow International Airport.

  • Project : Hallmark Hotel
  • Duration : 2 Weeks .
  • Work Carried Out : 15m pool refurbishment.
See Our Work

KIa (Dunfermline)


At Flear and Thompson Kia, Dunfermline, they pride themselves in offering the highest level of care whether your current model needs servicing, or you are looking to buy a new or used Kia.

  • Project : Kia Dunfermline
  • Duration : 2 Weeks
  • Work Carried Out : Showroom and public toilets.
See Our Work

Skoda Stirling


West End Garage operate in the Central and East of Scotland with facilities in Edinburgh, Dunfermline and Stirling. Our accredited teams will provide all the advice and expertise you need to own and run a ŠKODA .

  • Project : Skoda Stirling
  • Duration : 2 Weeks.
  • Work Carried Out : Showroom, public and staff toilets.
See Our Work

Malcolm Allan Butchers


Malcolm Allan Butchers are a third generation family company who have been manufacturing quality Scottish meat products since 1954 . Their products are on sale in every town in Scotland and on many of the Islands.

  • Project : Malcolm Allan Butchers
  • Duration : 6 Weeks.
  • Work Carried Out : 2000m2 factory floor.
See Our Work

Michael Kors Edinburgh Airport


Michael Kors offers a lifestyle for the consummate jet setter that is as sophisticated as it is indulgent and as glamorous as it is modern.

  • Project : Michael Kors Edinburgh Airport.
  • Duration : 3 days
  • Work Carried Out : Shop floor and shop front
See Our Work

Brora Edinburgh Airport


Scottish chain selling cashmere clothing, accessories and baby products from their own mill.

  • Project : Brora Edinburgh Airport
  • Duration : 2 days.
  • Work Carried Out : Shop floor.
See Our Work

Peugeot Garage, Hardie Stirling


Established in 1958, Hardie has been representing Peugeot for over 30 years. We are quite unique in the motor trade as we are family owned and managed and are not restricted by or affiliated to any of the big motor chains.

  • Project : Peugeot Garage
  • Duration : 1 Week.
  • Work Carried Out : Showroom.
See Our Work